TUNING
About this task
The measurements obtained by this test are:
Hardware considerations
The following hard disk requirements apply to the SUT and, during some tests, to the destination systems that receive mail from the SUT:
Table 1. Hard disk requirements
Increase of 100KB an hour as impacted by the value of the nthIteration setting in the NOTES.INI file.
The growth rate of each database is a function of the ratio of the number of users and recipients sending and receiving mail.
Tips for running the R5IMAP Workload test
Procedure
1. Use these server commands.
3. To minimize environment troubleshooting, put IP information -- for example, host information -- in the \etc\hosts file or its equivalent on the SUT and driver directories.
4. From the SUT console, enter this command to display additional routing information:
Make sure that you already completed the procedure to run the R5IMAP Initialization workload.
Results
For more information about the R5IMAP Initialization workload, see the topic R5IMAP Initialization workload.
1. In the NOTES.INI file on the SUT, verify that the Server Tasks setting includes both IMAP and LDAP.
2. On the Basics tab of the Server document for the SUT, make sure that the SMTP Listener Task is enabled.
3. For optimal performance, create a Configuration Settings document in the Domino Directory and do the following:
4. On the Domino Administrator client, start Server.Load.
5. In the Test Type field, choose Built-In, and then choose R5 IMAP workload from the list.
6. In the Build Recipient List using Name and Address Book field, enter the name of the SUT and its Domino Directory in the format servername/org!!dominodirectory.NSF -- for example, Server1/Renovations!!NAMES.NSF.
7. Click the Test Parameters tab, and do the following:
8. Click the Script Variables tab, and enter these values:
9. Click the Stop Conditions tab to set a stop condition.
10. Click Execute.
11. Select metrics to monitor.
12. In the Server to receive console commands field, enter the name of the SUT.
13. Click Start Test.
Related concepts Running the built-in Server.Load workloads
Related tasks R5IMAP Initialization workload Setting a Server.Load stop condition Monitoring Server.Load metrics Tips for running a Server.Load test
Related reference Built-in and custom Server.Load scripts